Trajectory Tool
Inputs
Survey Settings
Enter a trajectory name, vertical section azimuth, and normalisation distance for dogleg severity and build/walk rates. The normalisation distance is the interval over which these rates are calculated (e.g. 30m or 100ft).
Survey Data
Enter survey stations as MD, INC, AZI (comma, tab, semicolon, or space separated). Include a header row or start with data.
Manage Surveys
Save and load survey configurations.
Output
Survey Results
Enter survey data and click Parse & Calculate to view results.